suitable for technology development, manufacturing and storage. new industrial park. highway D8. offices. conference rooms. restaurant. high standards. energy efficient. customizable.

suitable for technology development, manufacturing and storage.
new industrial park. highway D8.
offices. conference rooms. restaurant
high standards. energy efficient.
customizable.

technologický park Nord Port - poloha
technologický park NordPort budova B

Nord Port park

• total area 62,654 m2
• total building area 12,798 m2
• manufacturing halls 7,675 m2
• warehouses 1,654 m2
• outdoor storage area 2,510 m2

A

building A
administration, accommodation, technical and sanitary rooms

B

building B
manufacture

C

building C
warehouse

D

building D
manufacture

E

building E
manufacture

F

building F
manufacture

retention reservoir

sewage water treatment plant

possible further construction area

energobox

energobox

energobox

diesel generator set, main transformer, gas regulation station, automatic water pressure station

power connection ready for e-bus charging

water tower

charging station for EVs

control room, energobox for building A, substation (incl. DC), datacente

photovoltaics to be installed on roofs

• offices, conference or other commercial space incl. technical & sanitary facilities 2,472 m2
• other spaces for rent 1,809 m2
• canteen 70 seats
• parking for personal vehicles 220 places
• area for further construction 6,620 m2

1st floor:

canteen and social facilities
control and technical rooms

2nd floor and 3rd floor:

air-conditioned offices and conference rooms
office spaces or accommodation (to be completed)

1st floor:

• main reception
• canteen with 70 seats
• kitchen and related facilities
• space with dedicated entrance and glass walls suitable for a store or a showroom (to be completed based on renter’s requirements)
• park’s Central Control Room
• energobox for Building A incl. DC substation
• data center with the main router and data distribution grid to other building

space for rent in building :

• office space and conference rooms on the 2nd and 3rd floor 937 m2
• office space or accommodation (to be completed). 1,392 m2
• space for a commercial use on the 1st floor (to be completed) 417 m2
• canteen and dayroom incl. utility room on the 1st floor 416 m2

manufacturing hall

• single story hall: two separated manufacturing spaces which can be further divided into modules
• access: direct entrance trough gate for each module (NW side) and trough doors (NW and SE side)
• gate dimensions: height 4.15 m, width 3 m
• ceiling heigh: 9.13 m (trusses 7.56 m)
• maximum floor load: 5 t/m2
• building does not have its own sanitary facilities (may be added as a built-in)

space for rent in building B:

• total manufacturing area 2,303 m2
• adjacent outdoor storage area 820 m2

warehouse

• single story warehouse which can be divided into modules
• access: direct entrance trough gate for each module (NW side), and through doors (NW and SE side)
• gate dimensions: height 4.15 m, width 3 m
• ceiling heigh: 9.13 m (trusses 7.49 m)
• maximum floor load: 5 t/m2
• building does not have its own sanitary facilities

space for rent in building C:

• warehouse area 1,613 m2
• adjacent outdoor storage area 680 m2

1st floor:

manufacturing hall
showroom

2nd floor:

office space and sanitary facilities

• partially two-story building:

• manufacturing hall can be divided into modules
• the two-story section can be used as a showroom (1st floor) and office space (2nd floor)

• access: direct entrance trough gate for each module (SE side) and trough doors (NW and SE side)
• gate dimensions: height 4.15 m, width 3 m
• ceiling heigh: 9.36 m (trusses 7.56 m)
• maximum floor load: 5 t/m2
• building is equipped with sanitary facilities

space for rent in building D:

• manufacturing area (1st floor) 1,605 m2
• showroom incl. sanitary room 415 m2
• adjacent outdoor storage area 300 m2

manufacturing hall

• single story manufacturing hall with administration and sanitary built-ins
• one two story admin. built in (7.5 x 7.5 m) already in place
• access: direct entrance through gate for each module (SE side) and trough doors (NW and SE side)
• gate dimensions: height 4.15 m, width 3 m
• ceiling heigh: 9 m (trusses 7.1 m)
• maximum floor load: 5 t/m 2
• building E is connected with Building F where sanitary facilities are located

space for rent in building E:

• manufacturing area 2,037 m2
• adjacent outdoor storage area 180 m2

manufacturing hall

• single story manufacturing hall with administration and sanitary built-ins
• access: direct entrance trough gate for each module (SE side), and trough doors (NW and SE side) + 2 loading docks with air curtains on SW side
• gate dimensions: height 4.15 m, width 3 m
• ceiling heigh: 9 m (trusses 7.1 m)
• maximum floor load: 5 t/m2
• building F is connected with building E

space for rent in building F:

• manufacturing area 1,695 m2
• offices incl. sanitary rooms 700 m2
• adjacent outdoor storage area 530 m2

roads & outdoor storage area

• service roads passable for heavy trucks
• 220 parking spaces with EV charging station
• park’s own bus stop ready for operation
• 2,510 m2 outdoor storage areas

technology

heating & cooling

heating & cooling

manufacturing halls and warehouses: 3 heat pumps (geothermal) & 3 backup gas condensing boilers installed in adjacent energoboxes, plus chiller and a desk exchanger int the main office building
view list

electricity generation

electricity generation

rooftop mounted photovoltaic powerplant with capacity of about 1 MWp to be installed in 2023, possibly including battery storage
view list

gas distribution

gas distribution

connected to high pressure gas distribution grid (VTL) • the gas boilers (in energoboxes) are connected via medium pressure grid (STL)
view list

lighting

lighting

LED lights with Digital Addressable Lighting Interface DALI, Em ≤ 500 lx, controlled via KNX system
view list

EV charging

EV charging

main parking lot equipped with a 50 kW EV charger, additional installation of chargers is possible • a power connection ready for e-bus charging
view list

air quality

air quality

2 meteostations (air quality monitoring, precipitation monitoring etc.
view list

hot water

hot water

manufacturing halls: via electric boilers installed in built-in service rooms • main office building: hot water tanks heated by gas boilers
view list

electricity distribution

electricity distribution

a local distribution network operated by the owner of the park • the total reserved power capacity is currently 4.04 MW and can be further increased • a DC grid is also available
view list

water supply and wastewater

water supply and wastewater

connected to the public drinking water grid • own water tower to maintain required water pressure • own sewage water treatment plant • greywater system ready for use
view list

internet connection

internet connection

optical cable connected to the Building A and distributed further, 1 GB capacity • a wireless internet antenna installed on the water tower
view list

security

security

24-hour security, electronic building security system, CCTV system, fire alarm station, electronic fire alarm system
view list

heating & cooling

heating & cooling

manufacturing halls and warehouses: 3 heat pumps (geothermal) & 3 backup gas condensing boilers installed in adjacent energoboxes, plus chiller and a desk exchanger int the main office building
view list

hot water

hot water

manufacturing halls: via electric boilers installed in built-in service rooms • main office building: hot water tanks heated by gas boilers
view list

electricity generation

electricity generation

rooftop mounted photovoltaic powerplant with capacity of about 1 MWp to be installed in 2023, possibly including battery storage
view list

electricity distribution

electricity distribution

a local distribution network operated by the owner of the park • the total reserved power capacity is currently 4.04 MW and can be further increased • a DC grid is also available
view list

gas distribution

gas distribution

connected to high pressure gas distribution grid (VTL) • the gas boilers (in energoboxes) are connected via medium pressure grid (STL)
view list

water supply and wastewater

water supply and wastewater

connected to the public drinking water grid • own water tower to maintain required water pressure • own sewage water treatment plant • greywater system ready for use
view list

lighting

lighting

LED lights with Digital Addressable Lighting Interface DALI, Em ≤ 500 lx, controlled via KNX system
view list

internet connection

internet

optical cable connected to the Building A and distributed further, 1 GB capacity • a wireless internet antenna installed on the water tower
view list

EV charging

EV charging

main parking lot equipped with a 50 kW EV charger, additional installation of chargers is possible • a power connection ready for e-bus charging
view list

security

security

24-hour security, electronic building security system, CCTV system, fire alarm station, electronic fire alarm system
view list

air quality

air quality

2 meteostations (air quality monitoring, precipitation monitoring etc.
view list

history & current state of Nord Port

• 2012: Building permit obtained
• 2014: Main construction begins
• 2016: Main construction completed, trial operation begins
• october 2020: Acquisition by PORTA SPES, a.s.

The construction of the industrial park was completed by the original owner Nupharo Park, a.s. in 2016. They declared
bankruptcy in January 2018 and the park became a part of the insolvency estate. In 2020 the park was sold by an
independent administrator via a non-auction sale to the new owner PORTA SPES, a.s.

*Zpeněžením majetkové podstaty zanikly v rozsahu, v němž se týkají zpeněženého majetku, účinky nařízení výkonu rozhodnutí nebo exekuce, účinky doručení vyrozumění o zahájení exekuce a účinky vydaných exekučních příkazů a ostatní závady váznoucí na zpeněžovaném majetku, vyjma služebností a reálných břemen.